IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 7-2: Fixed Route Operating Effectiveness Indicators<br />

Description Measure Proposed Target FY 2006 Actual<br />

On-Time Performance<br />

For all timepoints and terminals,<br />

percentage of buses that:<br />

-leave 1.5 minutes early<br />

-are "on-time" within 5.5 minutes late<br />

-None should leave early<br />

-95% or more should be “on-time”<br />

at timed transfer (A) points<br />

-90% or more should be "on-time"<br />

for entire route<br />

-95% “on-time” at timed transfer (A)<br />

points<br />

-81% weekday average "on- time"<br />

(within 1.5 minutes early and 5.5<br />

minutes late) for entire route<br />

Service Reliability % scheduled pullouts 100% 95%<br />

Passenger Safety Preventable collisions per million miles 6 7<br />

Figure 7-3: Fixed Route Vehicle Efficiency Indicators<br />

Description Measure Proposed Target FY 2006 Actual<br />

Vehicle Failure Rate<br />

Vehicle miles between valid mechanical<br />

failures per NTD guidelines<br />

5,000 5,000<br />

Farebox Failure Rate Total miles between valid farebox failures 70,000 86,000<br />

July 11, 2007 146