01.11.2014 Views

Short Range Transit Plan 2008-2013 - Omnitrans

Short Range Transit Plan 2008-2013 - Omnitrans

Short Range Transit Plan 2008-2013 - Omnitrans

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

10.2 Stage 2 FY <strong>2008</strong><br />

The second stage of the Constrained Service <strong>Plan</strong> is to be implemented in September 2007. It covers<br />

the following route and service changes:<br />

Route 8 – Eliminate the 4th Street diversion in the north end<br />

Route 28 – Discontinue (to be replaced by an extended Route 71)<br />

Route 60 – Discontinue east section from Chaffey College (to be replaced by an extended Route 70).<br />

Extend west section along Holt to the Ontario Transcenter and then to Mountain and the Montclair<br />

Transcenter to replace Route 62 in this corridor. The extension, between the Ontario and Montclair<br />

Transcenters, would have 30-minute frequencies similar to Route 62 in this corridor. The Chaffey College<br />

section east of the Ontario Transcenter would not have Sunday service. Reduce the weekday span to 15<br />

hours.<br />

Route 62 – Discontinue present service north of the Ontario Transcenter (to be replaced by an extension<br />

of Route 60 and 67). Extend the route to run on Euclid to 21 st St. in the north end. On weekdays and<br />

Saturdays, extend the south end to serve Mountain, the new Chaffey College on Eucalyptus, and Chino<br />

Hills Marketplace. Use Edison until the roads are completed in this area. Interline or time-transfer Route<br />

62 with Route 65 at Chino Hills Marketplace for direct service from the south end to Chino Hills and the<br />

Central corridor.<br />

Route 65 – Discontinue the Los Serranos loop and replace with a shorter loop using Valle Vista. Reduce<br />

mid-day and evening frequencies on the loop from 30 to 60-minutes.<br />

Route 67 – Discontinue the Euclid section and extend to the Montclair Transcenter via 19th, Mountain<br />

and 7th replacing Route 62 in these corridors. Increase weekday peak period frequencies from 60 to 30-<br />

minutes.<br />

Route 70 – Restructure the south end section to serve the Francis, Riverside and Haven corridors to the<br />

Ontario Mills Mall. Extend the route north to the Rancho Cucamonga Metrolink Station on Milliken, the<br />

Civic Center at Haven and Foothill, and the areas served by the east section of Route 60 to Chaffey<br />

College. These changes will enable Routes 60 East and 75 to be discontinued.<br />

Route 71 – Restructure the west section to serve the Cherry, Mulberry, Marley, and Jurupa corridors in<br />

South Ridge, and the Etiwanda and 4 th St. corridors to the Ontario Mills Mall, enabling Route 28 to be<br />

discontinued. Drop the Poplar-Citrus loop and extend the east section up Sierra to South Highland and<br />

the Sierra Lakes Parkway.<br />

Route 75 – Discontinue (to be replaced by a restructured Route 70)<br />

The Stage 2 changes will be revenue hours neutral, as they will result in no net increase in the revenue<br />

hours resulting from the Stage 1 changes. The Stage 2 weekday service characteristics are shown in<br />

Figure 10-4 through Figure 10-6.<br />

July 11, 2007 210

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!