IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

3. Unconstrained <strong>Plan</strong> – The objective of this plan is to improve the structures, frequencies and spans<br />

of the fixed routes so that the all areas of the East and West Valleys are properly served by transit. The<br />

plan would include the changes suggested for the Constrained and Partially Constrained <strong>Plan</strong>s plus<br />

further changes to cover all of the improvements suggested in the needs assessment. It would improve<br />

the structure, frequency and spans of the base and local routes, extend and add routes into the<br />

developing unserved areas and corridors in the East and West Valleys, and provide commuter express<br />

services into Orange County. Figure 9-11 through Figure 9-14 show the operating characteristics of the<br />

plan. The expected impacts on <strong>Omnitrans</strong> resources are as follows:<br />

• Daily revenue hours could increase to 2,600 under this plan, which is a 30%<br />

increase over the present system. Annual revenue service hours could increase<br />

to about 800,000 revenue hours from the present system of 634,000.<br />

• Daily ridership would be expected to increase to 68,000 unlinked passenger trips,<br />

which would cover most of the unmet demands. This is a 20% increase over the<br />

present system. Annual ridership could increase to about 19,000,000 from the<br />

expected 15,500,000 unlinked passenger trips in FY 2007.<br />

• About 522 operators would be required for the Unconstrained <strong>Plan</strong>, or 107 more<br />

the present system.<br />

• About 183 peak buses would be required for the Unconstrained <strong>Plan</strong>, or 40 more<br />

than the present system.<br />

Because of the financial constraints, the Constrained <strong>Plan</strong> is the recommended plan in the short term<br />

over the <strong>2008</strong>-2011 period.<br />

July 11, 2007 193