01.01.2015 Views

5-speed manual gearbox 0A4.pdf

5-speed manual gearbox 0A4.pdf

5-speed manual gearbox 0A4.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Protected by copyright. Copying for private or commercial purposes, in part or in whole, is not permitted unless authorised by Volkswagen AG. Volkswagen AG does not guarantee or accept any liability with respect to the correctness of information<br />

in this document. Copyright by Volkswagen AG.<br />

Pressing on sleeve for 5th gear needle bearing<br />

Golf Variant 2007 ➤ , Golf Variant 2010 ➤ , Jetta 2005 ➤ , Jetta 2011 ➤<br />

5-<strong>speed</strong> <strong>manual</strong> <strong>gearbox</strong> 0A4 - Edition 04.2010<br />

Pressing out tapered roller bearing outer race<br />

Pressing in tapered roller bearing outer race<br />

– Install with shim after adjusting input shaft.<br />

5th gear synchronization<br />

1 - Springs for lock pieces<br />

2 - Locking collar with 3 recesses -arrows A- for the locking<br />

pieces -item 4-<br />

3 - Synchro-hub<br />

4 - Locking pieces - installation position: thin extension<br />

-arrow B- faces the pointed teeth of the locking collar -2-<br />

1. Input shaft 161

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!