Development<br />

Commence detailed studies <strong>for</strong> <strong>the</strong> development of Runway 13/31<br />

Trigger<br />

Adoption of Runway alignment<br />

FIGURE 11-1 STAGED DEVELOMENT PLAN (STAGE 1)<br />

Development<br />

Trigger<br />

Stage 2 Expand RPT apron by 1 x B737/A320 position Growth in traffic – demand <strong>for</strong><br />

additional stand during peak<br />

periods<br />

Construct new Code C taxiway parallel to Taxiway E. Close taxiway E.<br />

Expand passenger terminal:<br />

International facilities<br />

Check-in (includes CBS facility)<br />

Baggage make-up<br />

Baggage claim (convert existing “Tee” belts to “U” belts)<br />

Establish new coach bays near <strong>the</strong> arrivals end of <strong>the</strong> terminal<br />

Car park expansion:<br />

Second stage - 2 level short term<br />

Second stage - 3 level long term<br />

Expand sou<strong>the</strong>rn GA area (serviced sites plus apron)<br />

Expand western GA area (serviced sites plus apron):<br />

Additional fixed wing facility sites<br />

New helicopter facility sites<br />

Provide Code C taxiway to Runway 36 threshold and Taxiway A<br />

Review Runway 13/31 construction triggers<br />

Provide Code C taxiway loop<br />

Increased demand, including<br />

introduction of regular<br />

international services.<br />

Introduction of checked bag<br />

screening at Sunshine Coast<br />

Airport<br />

Passenger terminal expansion<br />

Increased parking demand<br />

Increased GA demand<br />

Increased GA demand and to<br />

relocate helicopter activities from<br />

Sou<strong>the</strong>rn GA area<br />

Increased delays due to runway<br />

occupancy<br />

Increased demand, including<br />

introduction of regular<br />

international services.<br />

FIGURE 11-2 STAGED DEVELOMENT PLAN (STAGE 2)<br />

Development<br />

Trigger<br />

Stage 3 Expand RPT apron by 2 x B737/A320 position Traffic Growth –additional peak stand demand<br />

Car park expansion:<br />

Third stage - 2 level short term<br />

Third stage - 3 level long term<br />

Expand landside road system<br />

Expand Sou<strong>the</strong>rn GA area (serviced sites plus apron)<br />

Expand western GA area (serviced sites plus apron):<br />

Additional fixed wing facility sites<br />

Additional helicopter facility sites<br />

Provide nor<strong>the</strong>rn extension of Code C Parallel Taxiway<br />

Increased parking demand<br />

Access to new GA facilities<br />

Increased GA demand<br />

Increased demand <strong>for</strong> GA and helicopter<br />

facilities (and to relocate helicopter activities<br />

from Sou<strong>the</strong>rn GA area)<br />

Increased delays due to runway occupancy<br />

SUNSHINE COAST AIRPORT<br />

MASTER PLAN SEPTEMBER 2007<br />

45