08.04.2015 Views

Business Case for the SunShine CoaSt airport Master Plan

Business Case for the SunShine CoaSt airport Master Plan

Business Case for the SunShine CoaSt airport Master Plan

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

and 4.5.1 of <strong>the</strong> PwC CBA report.<br />

5 | P a g e<br />

Incremental returns from leased precincts -<br />

Methodology and calculation parameters<br />

are included at sections 3.3, 4.3, 4.4.2<br />

and 4.5.1 of <strong>the</strong> PwC CBA report.<br />

Passenger savings from avoided in-bound diversions -<br />

Methodology and calculation parameters<br />

are included at sections<br />

3.4, 4.4.2 and 4.5.1 of <strong>the</strong> PwC CBA<br />

report.<br />

Savings from avoided out-bound delays -<br />

Methodology and calculation parameters<br />

are included at sections<br />

3.4, 4.4.2 and 4.5.1 of <strong>the</strong> PwC CBA<br />

report.<br />

Savings from avoided passenger ‘leakage’ to/from Brisbane -<br />

Methodology and calculation parameters<br />

are included at sections<br />

3.4, 4.4.2 and 4.5.1 of <strong>the</strong> PwC CBA<br />

report.<br />

Airline savings from avoided in-bound diversions -<br />

Methodology and calculation parameters<br />

are included at sections<br />

3.4, 4.4.2 and 4.5.1 of <strong>the</strong> PwC CBA<br />

report.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!