Stage 2 and 3: Problem Identification and Problem Assessment<br />

The full TFI Study is attached in <strong>the</strong> <strong>Business</strong> <strong>Case</strong> document as Appendix C.<br />

The current runway and terminal building have an immunity to flood events up to and<br />

including <strong>the</strong> one per cent AEP storm event. The combined effects of rising sea-levels<br />

and greater storm intensity arising from predicted climate change will result in this<br />

level of immunity being compromised in <strong>the</strong> future. The redevelopment of SCA<br />

provides an opportunity to build climate change resilience in to this essential element<br />

of <strong>the</strong> regions transport infrastructure.<br />

14 | P a g e