<strong>Business</strong> <strong>Case</strong> <strong>for</strong> <strong>the</strong> Sunshine Coast Airport n <strong>Master</strong> <strong>Plan</strong> (November 2009)<br />

Staged Development <strong>Plan</strong> (Stage 1)<br />

Stage 1<br />

Development Trigger Status<br />

Secure and preserve <strong>the</strong> land required <strong>for</strong> <strong>the</strong> future,<br />

new east-west runway 13/31, associated infrastructure<br />

and its surrounding buffer zones<br />

Re-configure RPT apron to allow independent<br />

operation of all four existing B737/A320 stands. Include<br />

temporary link from apron edge taxi lane to taxiway E<br />

Accommodate Checked Baggage Screening (CBS)<br />

areas within baggage handling areas.<br />

Develop retail departures lounge in terminal, plus<br />

increased security check facilities and landside outdoor<br />

café<br />

Establish new <strong>airport</strong> access road<br />

Expand landside road system<br />

Establish new car park layout<br />

Adoption of runway alignment<br />

Provide <strong>for</strong> independent<br />

operation at each stand<br />

Regulatory requirement<br />

Current departure lounge<br />

inadequate.<br />

Increased traffic and to<br />

provide safer, enhanced<br />

<strong>airport</strong> access<br />

Access to new commercial<br />

sites and GA facilities<br />

Demand <strong>for</strong> additional car<br />

parking<br />

Runway<br />

Complete<br />

Design complete<br />

construction<br />

09/10<br />

Complete<br />

Complete<br />

Complete<br />

Complete<br />

Complete<br />

Establish additional serviced commercial sites Demand <strong>for</strong> commercial sites Ongoing<br />

Commence detailed studies <strong>for</strong> <strong>the</strong> development of <strong>the</strong><br />

new runway 13/31<br />

Adoption of runway alignment<br />

Ongoing<br />

Staged Development <strong>Plan</strong> (Stage 2)<br />

Development Trigger Status<br />

Stage 2 Expand RPT apron by 1 x B737/A320 position Growth in traffic – demand<br />

<strong>for</strong> additional stand during<br />

peak periods<br />

Construct new Code C taxiway parallel to taxiway E.<br />

Close taxiway E.<br />

Expand passenger terminal:<br />

International facilities<br />

Check-in (includes CBS facility)<br />

Baggage make-up<br />

Baggage claim (convert existing “Tee” belts to “U” belts)<br />

Establish new coach bays near <strong>the</strong> arrivals end of <strong>the</strong><br />

terminal<br />

Provide Code C taxiway<br />

loop<br />

Increased demand,<br />

including introduction<br />

of regular international<br />

services. Introduction of<br />

checked bag screening at<br />

Sunshine Coast Airport<br />

Passenger terminal<br />

expansion<br />

Under design<br />

Under design<br />

CBS complete<br />

Terminal Stage 1<br />

complete<br />

International<br />

expansion design<br />

in progress<br />

Not commenced<br />

Car park expansion:<br />

Second stage – 2 level short term<br />

Second stage – 3 level long term Increased parking demand Not commenced<br />

Expand sou<strong>the</strong>rn GA area (serviced sites plus apron) Increased GA demand Under design<br />

Expand western GA area (serviced sites plus apron):<br />

Additional fixed wing facility sites<br />

New helicopter facility sites<br />

Provide Code C taxiway to runway 36 threshold and<br />

taxiway A<br />

Review runway 13/31 construction triggers<br />

Increased GA demand<br />

and to relocate helicopter<br />

activities from Sou<strong>the</strong>rn<br />

GA area<br />

Increased delays due to<br />

runway occupancy<br />

Increased demand,<br />

including introduction<br />

of regular international<br />

services.<br />

Complete<br />

Under design<br />

Ongoing<br />