Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
9ToolManagement 9.3 Tool management start-up in the PLC<br />
9.3.2 Start-up sequence<br />
Requirements<br />
Execution<br />
9-120<br />
S PCU start-up is carried out and the connection set up to the NC.<br />
S NCK start-up is carried out with the NC machine data for <strong>ShopMill</strong>.<br />
S The standard basic program is loaded.<br />
S Adapt one of the following source files and compile it:<br />
-- TM_WO_GR.AWL (data transfer without dual gripper)<br />
-- TM_W_GR.AWL (data transfer with dual gripper)<br />
12.01<br />
Source files TM_WO_GR.AWL and TM_W_GR.AWL contain the following<br />
blocks<br />
-- FC100 (block for tool management configuration)<br />
-- FB110, DB110 (blocks for data transfer in tool management)<br />
The blocks for transferring tool management data (FB110, DB110) must be<br />
adapted to suit the individual machine.<br />
S Call the blocks in OB1 and OB100:<br />
-- Call FC100 in OB100 (before FB1)<br />
-- CallFB110inOB1(afterFC30)<br />
The specified call sequence for these blocks is mandatory.<br />
S Load the blocks to the PLC<br />
Note<br />
Tool management start-up in the PLC is carried out in conjunction with <strong>ShopMill</strong><br />
start-up.<br />
E Siemens AG, 2001. All rights reserved<br />
<strong>SINUMERIK</strong> <strong>840D</strong>/<strong>810D</strong> Description of Functions <strong>ShopMill</strong> (FBSP) - 12.01 Edition