100<br />
B4 - PLANS AND PROCEDURES Threat category Responsibility<br />
Elements I II III IV V O L N<br />
ensuring medical treatment of casualties, including protective action, if warranted, based on conditions<br />
at the facility in order to reduce the risk of severe deterministic health effects;<br />
5) assessment of the state of the facility or practice and the actions to be taken on the site to limit the<br />
extent of any radioactive release;<br />
6) the chain of command and communication, including a description of related facilities and procedures;<br />
7) an inventory of the emergency equipment to be kept in readiness at specified locations;<br />
8) the actions to be taken by persons and organizations involved in the implementation of the plan for<br />
each class of emergency; and<br />
9) arrangements for declaring the termination of an emergency (5.20).<br />
This can be accomplished by having an emergency plan consistent with the outline in Appendix 12. <br />
B4.9 Develop procedures, analytical tools and computer programs to perform the functions specified to<br />
meet the requirements for emergency response (5.21).<br />
Develop the tools needed to perform the emergency response functions specified in Section 4.2. Develop<br />
procedures and technical support for all tasks that are not normally performed and provide detailed<br />
instructions and the required information. The technical aspects of the procedures used by<br />
groups/organizations performing the same tasks (e.g. sampling or analysis) should be the same.<br />
Develop procedures according to a writer guide in order to have a common structure, appearance and<br />
terms. The procedures should:<br />
1) be, as much as possible, stand-alone (that is provide all the information needed without referring to<br />
other procedures, manuals or references);<br />
2) identify the response position or team responsible for their performance;<br />
3) prominently display the entry conditions on the first page (when the procedure is to be used);<br />
4) list safety steps (e.g. notify control room,) performed before use of the procedures;<br />
5) list tools, protective equipment, resources or information needed to use the procedures;<br />
6) identify the customer - who gets the product (if appropriate);<br />
7) show the date approved and identify who is responsible for maintenance of the procedures ;be<br />
provided for each individual or team performing a task/function;