132<br />

Site area emergency<br />

Emergency class<br />

description<br />

Events resulting in a major decrease in the<br />

level of protection for those on the site and<br />

near the facility.<br />

This could be:<br />

- a major decrease in the level of<br />

protection provided to the core of a<br />

reactor or a large amount of actively<br />

cooled spent fuel.<br />

- a major decrease in protection against an<br />

accidental unshielded criticality<br />

- conditions such that any additional<br />

failures could result in a general<br />

emergency<br />

- doses off site approaching the urgent<br />

protective action intervention levels<br />

- terrorist or criminal activity with the<br />

potential to disrupt performance of<br />

critical safety functions or result in severe<br />

release or exposure.<br />

Immediate response actions<br />

Threat category I and II facilities<br />

Operator and on-site:<br />

- Take life saving actions and give first aid on site.<br />

- Notify off-site officials, recommend preparations be made to implement protective actions, consistent with<br />

Appendix 11, and request emergency services if needed.<br />

- Evacuate non-essential personnel and visitors or provide them with special on-site shelter, and account for all<br />

persons on the site.<br />

- Provide protection from hazardous conditions for on-site emergency response personnel and from those arriving<br />

from off the site.<br />

- Activate full response.<br />

- Take action to mitigate the emergency to include requesting off-site assistance; provide technical assistance to<br />

control room.<br />

- Conduct off-site monitoring near facility and integrate into the RMAC (see Appendix 14).<br />

- Establish continuous communication with off-site officials.<br />

- Establish, with off-site officials, an integrated response under the ICS (see Appendix 13).<br />

- Conduct, with off-site officials, joint media briefings at the PIC (see Appendix 14).<br />

- Reassess the classification and revise if warranted.