The co-ordinator should have in-depth technical and operational knowledge of emergency<br />

preparedness and response issues and should have sufficient decisional authority to ensure an<br />

effective co-ordination process. The co-ordinator should be provided with sufficient staff and<br />

long term resources to develop and maintain the response capability once it has been<br />

established. This should include a multi-year budget.<br />

The co-ordinator should involve all parties with an interest in the development and<br />

implementation of the emergency plan(s) in the planning process at the early stage.<br />

Attempting to co-ordinate “after the fact” may actually be counterproductive by creating<br />

opposition to obligations being imposed on those who had no part in assigning them.<br />

Develop an outline of the integrated plans<br />

The process in developing a response capability is complex. It is helpful, before planning<br />

begins, to have an outline of the content of the final set of integrated emergency plans for the<br />

national, facility and local levels. This will add structure, promote integration and provide a<br />

skeleton on which to build. The emergency plan outline in Appendix 12 can be used for this<br />

process.<br />

Tasks<br />

Example Implementation Time Line<br />

Designate national planning<br />

co-ordinator<br />

1<br />

Review national policy<br />

2<br />

3<br />

Perform threat assessment<br />

Develop planning basis<br />

4 Develop concept of<br />

operations and allocate<br />

responsibilities<br />

5<br />

Develop interim capability<br />

6<br />

7<br />

8<br />

9<br />

Write NREP<br />

Present NREP<br />

Implement detailed plans<br />

Test capability<br />

10 Establish ongoing QA<br />

programme<br />

Preliminary result used to develop the interim capability (Task 5).<br />

FIG .5. Overview of the development of an emergency response capability.<br />