10.07.2015 Views

C•CURE 800/8000 Hardware Configuration Guide - Tyco Security ...

C•CURE 800/8000 Hardware Configuration Guide - Tyco Security ...

C•CURE 800/8000 Hardware Configuration Guide - Tyco Security ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Misc TabMisc TabConfiguring the Secondary Communications TestThe secondary communications path is periodically tested to verify that theconnection will function correctly in the event of a failure on the primarycommunications path. The Misc tab in the Cluster dialog box lets youconfigure the test for the secondary communications path.NOTEThe Secondary Communications Test is not supported in this version ofC•CURE System.This tab also lets you configure the maximum number of unacknowledgedmessages that are permitted for the controllers in the cluster.To configure the test for the secondary communications path1. From the Cluster dialog box, click the Misc tab. The Misc tab opens,shown in Figure 2-18.Figure 2-18: Misc Tab2. Provide the information shown in Table 2-10 on page 2-51.2–50 C•CURE <strong>800</strong>/<strong>800</strong>0 <strong>Hardware</strong> <strong>Configuration</strong> <strong>Guide</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!