10.07.2015 Views

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>ARMY</strong> TM 9-<strong>6115</strong>-<strong>464</strong>-<strong>34</strong><strong>AIR</strong> <strong>FORCE</strong> <strong>35C2</strong>-3-445-2NAVY NAVFAC P-8-624-<strong>34</strong>(n) Make ten or twelve pencil marks, equally spaced, across valve seat.(o) Install valve, press firmly, and rotate approximately one quarter of a turn.(P) Remove valve and observe pencil marks. If marks are rubbed out, valve is seating properly. If allpencil marks are not rubbed out, repeat grinding process.CAUTIONMark each valve to insure that it will be installed in the seat into which it was ground.Failure to observe this caution could result in equipment damage.(q) Repeat grinding process for each valve.d. Assembly.(1) Lubricate stem of intake valves (29) and exhaust valves (28) and insert into valve guides (31 and32).(2) Install bonnets (30), valve springs (26 and 27), spring seats (24 and 25) and locks (22 and 23).(3) Assemble rocker arm assembly as follows:NOTEBonnets are installed on intake valves only.(a) Install adjusting screws (19) into rocker arms (17).(b) Assemble springs (18), rocker arms (17), spacers (16) and mounting blocks (13,14, 15, and 22)onto rocker arm shaft (20). Make sure that mounting blocks and spacers are correctly installed(figure 3-47) and that oil holes in rocker arm shaft are correctly positioned (figure 3-48).(c) Install retaining rings (12).e. Installation.(1) Install cylinder head and rocker arm assembly in reverse order of removal procedures.(2) Tighten nuts to 75 Ibs.-ft. torque following the sequence of figure 3-49.(3) Repeat the sequence, tightening each nut to 125 Ibs.–ft. torque.(4) Again repeat the sequence, tightening each nut to a final torque of 160 Ibs.-ft. for 9/16 in. DIA stubsand 175 Ibs.-ft. for 5/8 in. DIA studs, as specifies in paragraph 1-6v.NOTENuts must be retorqued after 1 hour operation.(5) Refer to the Operator and Unit Maintenance Manual and adjust the valve tappet clearance to a“HOT” setting of 0.015 inch.3-114

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!