10.07.2015 Views

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>ARMY</strong> TM 9-<strong>6115</strong>-<strong>464</strong>-<strong>34</strong><strong>AIR</strong> <strong>FORCE</strong> <strong>TO</strong> <strong>35C2</strong>-3-445-2NAVY NAVFAC P-8-624-<strong>34</strong>(2) Install nuts (4), Iockwashers (3), 4 hex head screws (2).(3) Connect electrical connector P17 (1).e. Adjustment Procedure(1)(2)(3)(4)Disconnect the actuator linkage rod from the engine fuel shutoff lever.Place the generator set START-RUN- S<strong>TO</strong>P switch (located on the generator set control panel) inthe RUN position.Place the generator set BATTLE SHORT SWITCH (located on the generator set control panel) in theON (override) position.Beginning at the fully counterclockwise position, rotate the engine fuel shutoff lever in a clockwisedirection until a slight resistance is felt: hold the lever in this position.NOTEThis resistance is the fuel injection pump’s internal governor linkage hook engaging themetering valve arm.(5)(6)(7)(8)(9)(10)(11)(12)Move the actuator lever to the “full fuel” position. This is the direction against the spring resistance(fully counterclockwise).Measure the center to center distance between the hole in the fuel shutoff lever and the hole in theactuator lever. Adjust the rod ends on the threaded linkage rod so that the center to center distanceof the rod ends is the same or slightly longer than that measured between the fuel shutoff lever andthe actuator lever. (The 3.75 dimension is only approximate. If the linkage is too short, the actuatorlever will attain its “no fuel” position (full clockwise) before the fuel shutoff lever reaches its “no fuel”position; the fuel shutoff lever will never reach “no fuel”. If the linkage is too long, the actuator leverwill reach its “full fuel” (full counterclockwise) before the fuel shutoff lever reaches its "fuII fuel”position; full load will not be reached). It maybe necessary to readjust the position of the fuel shutofflever and/or the actuator lever to accommodate the center to center distance of the rod ends and toassure complete fuel shutoff and full load operation. Fuel shutoff and actuator lever adjustments arecovered under replacement procedures. Tighten the nuts on the linkage rod against the rod ends tomaintain proper spacing.Return the generator set START-RUN- S<strong>TO</strong>P switch to the S<strong>TO</strong>P position and the BATTLE SHORTswitch to the OFF position.Reconnect the actuator linkage rod end to the engine fuel shutoff lever.Adjust the control unit gain control to its approximate mid–range position.Adjust the control unit stability control to its fully counterclockwise position.Adjust the generator set frequency adjust potentiometer (pot) (located on the generator set controlpanel) to mid-range.Using a small screwdriver, slowly turn the control unit frequency adjust potentiometer (located on theleft side vertical face of the control unit) to the fully counterclockwise position (turn opposite increasearrow). This may require up to 22 turns. The generator set will now be operating at the lowestpossible engine governed speed.3-187

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!