10.07.2015 Views

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>ARMY</strong> TM 9-<strong>6115</strong>-<strong>464</strong>-<strong>34</strong><strong>AIR</strong> <strong>FORCE</strong> <strong>TO</strong> <strong>35C2</strong>-3-445-2NAVY NAVFAC P-8-624-<strong>34</strong>(6) Place o-ring (6) into groove of port plate (5), then position port plate against cam ring (7). Alignscribe marks and secure with screws (4).(7) Install ball (3), spring (2), and plug (1).e. Testing. Test coolant pump and motor assembly as directed in paragraph 5-4(e) (3).5-12. COOLANT LINES AND FlTTINGS.Refer to the Operator and Unit Maintenance Manual for electric winterization kit coolant lines and fittingsmaintenance instructions.5-13. WIRING HARNESS.Figure 5-10. Coolant Pump and Motor Assembly, Exploded Viewa. Refer to the Operator and Unit Maintenance Manual for wiring harness removal, cleaning, inspection, andrepair procedures.b. If the wiring harness has sustained damage and requires repair or rebuild, refer to figure 5-11 for layout,identification of material requirements and Appendix A reference for detailed soldering and replacementprocedures.c. Refer to Operator and Unit Maintenance Manual for wiring harness installation procedures.5-28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!