10.07.2015 Views

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>ARMY</strong> TM 9-<strong>6115</strong>-<strong>464</strong>-<strong>34</strong><strong>AIR</strong> <strong>FORCE</strong> <strong>TO</strong> <strong>35C2</strong>-3-445-2NAVY NAVFAC P-8-24-<strong>34</strong>e. Control Cubicle Terrminal Board.(1) Removal.(a) Tag and disconnect electrical leads to terminal board.(b) Remove nut and captive washer assemblies (3, figure 3-56) and screw (4) to remove terminalboard (5).(c) Remove screws (6) and jumpers (7) only if inspection indicates replacement is necessary.(2) Cleaning, Inspection, and Repair.(a)(b)(c)(d)(e)WARNINGSolvent, Dry Cleaning P–D-680, Type II is flammable and moderately toxic to skin,eyes and respiratory tract. Eye and skin protection required. Good general ventilationis normally adequate. Failure to observe this warning could result in servere personalinjury or death.Clean terminal board with a clean, lint–free cloth lightly moistened with solvent P–D- 680 Type Il.Visually inspect terminal board for cracks, burns, and corrosion. Check insulating material forcracks, breaks, and other damage.Using an ohmmeter, check jumpers for continuity.Check all threads for crossing, stripping, and peening.Replace any damaged or defective parts.(3) Installation.(a) If removed, install jumpers (7, figure 3-56), and screws (6).(b) Install terminal board (5), screw (4), nut and captive washer assemblies(3).(c) Connect electrical leads to terminal board.f. Control Cubicle Wiring Harness.(1) Refer to the Operator and Unit Maintenance Manual for wiring harness removal, cleaning, inspection,and repair procedures.(2) If the wiring harness has sustained damage and requires repair, or rebuild, refer to figure NO TAG forlayout, identification and material requirements and Appendix A for detailed soldering andreplacement procedures.(3) Refer to the Operator and Unit Maintenance Manual for wiring harness installation procedures.g. Control Cubicle Housing Assembly.(1) Removal. Remove screws (8, figure 3-56) and Iockwashers (9) to remove control cubicle housingassembly from generator set.(2) Disassembly.(a) Remove pin (10) to remove fastener (11) and seal (12).(b) Remove nut (13), door holder (14), fiat washer (15) and screw (16).(c) Remove nut and captive washer assemblies (17) and screws (18) to remove panel (19).(d) Remove pivot pin (20) and hinge (21) from housing (22) only if replacement is necessary.(3) Cleaning, Inspection, and Repair.3-137

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!