10.07.2015 Views

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>ARMY</strong> TM 9-<strong>6115</strong>-<strong>464</strong>-<strong>34</strong><strong>AIR</strong> <strong>FORCE</strong> <strong>TO</strong> <strong>35C2</strong>-3-445-2NAVY NAVFAC P-8-624-<strong>34</strong>Section XVII. MAINTENANCE OF SKID BASE ASSEMBLY3-102. GENERALThe skid base assembly provides the mounting points for the engine assembly, the generator assembly, andthe enclosure assembly. It contains the main fuel tank and the tool box. The generator set ground point is alsocontained in the skid base assembly. The skid base is also drilled to accept attachment of the wheel mountingkit. A metal sheet near the bottom of the skid base prevents the entry of debris. Drain holes are provided toprevent the accumulation of spilled liquids on the sheet.3-103. SKID BASE ASSEMBLY MAINTENANCE.a. Removal.(1) Refer to the Operator and Unit Maintenance Manual and remove the housing assembly.(2) Remove the relatable assembly (paragraph 3-99).(3) Remove engine assembly (paragraph 2-6).(4) Remove generator assembly (paragraph 2-7).(5) Remove main fuel tank (paragraph 3-16).(6) Remove the lifting frame (paragraph 3-101).b. Disassembly.NOTEIt is not necessary to completely disassemble the skid base assembly to replace asingle part. Only those parts requiring repair or replacement need be removed.(1) Remove self-locking nut (1, figure 3-152), flatwasher (2), nut (3) and ground terminal stud (4).(2) Remove nut (5), Iockwasher (6), screw (7) and tool box (8).(3) Remove screw (9), Iockwasher (10), panel blank (11) from skid base (12).c. Cleaning, Inspection, and Repair.(1) Clean all parts with dry cleaning solvent (Federal Specification P-D-680) and dry thoroughly. Ifnecessary, use a stiff bristle brush to remove caked deposits.(2) Visually inspect skid base for cracks, corrosion, defective paint and defective welds.(3) Inspect tool box for cracks, corrosion, damaged latch and hinge, and defective paint. Replace toolbox if damaged beyond repair.(4) Inspect ground terminal stud for burns, corrosion, damaged threads or other damage. Replace ifdefects are noted.(5) Repair cracks and defective welds in skid base by welding. File repairs to provide a smooth finish.(6) Remove corrosion and defective paint. Treat and repaint in accordance with service requirements.NOTEClean paint from ground terminal stud mounting to provide effective ground.3-319

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!