10.07.2015 Views

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>ARMY</strong> TM 9-<strong>6115</strong>-<strong>464</strong>-<strong>34</strong><strong>AIR</strong> <strong>FORCE</strong> <strong>TO</strong> <strong>35C2</strong>-3-445-2NAVY NAVFAC P-8-624-<strong>34</strong>(9)Install access cover (3), Iockwashers (2), and screw (1).(10)(11)(12)(a)Connect engine crankcase oil drain tube to fitting on skid base.Remove lifting device from hook located on the engine.Refer to the operator and unit maintenance manual TM 9-<strong>6115</strong>-<strong>464</strong>-12, sections 8,9 and 10 andaccomplish the following:Install winterization kits and connect electrical leads to engine sensors and connect coolant lines toengine oil pan.(b)(c)(d)(e)(f)(g)(h)(i)Connect starting aid tube assembly to engine intake manifold.Install air cleaner assembly and muffler.Connect electrical leads to engine accessories and install clamps.Connect hydraulic lines to hydraulic pump assembly and fill jydralic sump (precise generator setsonly).Connect day tank, secondary fuel filter, filter assembly and connect fuel lines to fuel strainer.Install top panel, doors and front housing.Install radiator, radiator hoses, shell assembly and shutter assembly.Fill engine and lubrication systems.2-7. GENERA<strong>TO</strong>R ASSEMBLY.a. Removal.(1) Refer to the Operator and Unit Maintenance Manual and accomplish the following:(a)(b)Remove rear housing assembly, doors, top panel, and grille.Tag and disconnect wiring harness from control cubicle and relay table components.NOTERecord location and position of wiring harness support clamps prior to removal tofacilitate installation.(2)Tag and disconnect generator leads to voltage reconnection board.NOTERecord routing of generator leads through current transformers to facilitate installation.(3)(4)(5)(6)(7)(8)Tag and disconnect electrical leads between voltage reconnection board and load terminal board.Remove voltage reconnection board (see the Operator and Unit Maintenance Manual TM9-<strong>6115</strong>-<strong>464</strong>-12, para. 4-71).Remove main load contactor and special relay assembly (paragraphs 3-84 and 3-90).Remove nuts (1, figure 2-2) Iockwashers (2), flat washers (3) and screws (4) to remove rear housingsupport (5).Remove screws (6), lockwashers (7) and flat washers (8).Remove screw (9), Iockwasher (10), flat washer (11) and standoff (12) to remove top relay table (13).2-17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!