10.07.2015 Views

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>ARMY</strong> TM 9-<strong>6115</strong>-<strong>464</strong>-<strong>34</strong><strong>AIR</strong> <strong>FORCE</strong> <strong>TO</strong> <strong>35C2</strong>-3-445-2NAVY NAVFAC P-8-624-<strong>34</strong>c. Procedure.(1) Preparation for test.(a) Connect the load instrumentation in accordance with the applicable figure of MIL-HDBK-705,Method 205.1, Paragraph 205.1.10.(b) Install a thermocouple to measure the same temperature as seen by the protective device sensor.(2) Test.(a) Start ando perate the generator set at rated voitage, rated frequency (speed), and rated load.(b) Block the cooling air to the generator set by any suitable means.(c) Continuously monitor the temperature seen by the thermocouple installed in paragraph 4-22c. (1)(b) above. Record the temperature at which the overtemperature protective device actuates.Record the temperature at which the coolant temperature indicator illuminates.CAUTIONIf the engine fails to shutdown when the temperature exceeds the maximum trip valuespecified in table 4-1, the test shall be immediately discontinued. Failure to observethis caution could result in equipment damage.d. Results. Compare the results with the requirement of table 4-1.4-22. PHASE SEQUENCE TEST (ROTATION)a. General. Unless the phase sequence (rotation) of the load terminals of a three-phase generator set iscorrect, serious damage or injury could be done to connected equipment and to personnel as a result ofreversed motor rotation or excessive current surges.b. Apparatus. A phase sequence (rotation) indicator as described and illustrated in MIL-HDBK-705, Method116.1 or a three–phase motor whose direction of operation in relation to phase sequence is known shall berequired.c. Procedure.(1) Connect the generator set load terminals to the applicable test apparatus for one of the setthree–phase voltage connections. Recheck the connections to insure that L1, L2 and L3 of thegenerator set are connected to L1, L2 and L3 of the test apparatus respectively.(2) Start and operate the generator set at rated voltage and frequency. The set indicating instrumentsshall be sufficient indication of output voltage and frequency.(3) Close the circuit interrupter and determine the direction of phase sequence (rotation) by observingthe indicator, or by noting the direction of rotation if a three-phase motor is used. Record results.(4) Check the phase sequence (rotation) of the power output of each power receptacle on the generatorset by connecting the applicable test apparatus to the receptacle and repeating steps (1) thru (3)above.(5) Repeat steps (a) thru (d) above for all other three-phase voltage output connections of the generatorset.d. Results. The phase sequence (rotation) as indicated by the test shall be checked against therequirements of table 4-1.4-22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!