10.07.2015 Views

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>ARMY</strong> TM 9-<strong>6115</strong>-<strong>464</strong>-<strong>34</strong><strong>AIR</strong> <strong>FORCE</strong> <strong>TO</strong> <strong>35C2</strong>-3-445-2NAVY NAVFAC P-8-624-<strong>34</strong>3-85. LOAD TERMINAL BOARD ASSEMBLY.a. Removal.WARNINGLethal voltages are present at the load terminal board when the generator set is inoperation. Do not attempt to perform maintenance on the load terminal board while thegenerator set is in operation. Serious electrical shock or death may result from failureto observe this warning.(1) Tag and disconnect electrical leads to load terminal board assembly.(2) Remove screws (1, figure 3-106), Iockwashers (2) and plastic shield (3).(3) Remove stand-off (4) and Iockwashers (5) to remove load connection terminal board assembly (6).b. DisassembIy. Remove nut (7, figure 3-106), nut (8), stud (9) and board (10).c. Cleaning, Inspection, and Repair.(1) Clean load terminal board with filtered compressed air and a soft bristle brush.(2) If necessary, wipe load terminal board assembly with a clean, lint–free cloth moistened with anapproved solvent.(3) Inspect load terminal board for warping, cracks, damaged threads, corroded terminals, and burns.(4) Replace any damaged or defective parts.d. Assembly. Position board (10, figure 3-106) to install stud (9), nut (8), and nut (7).d. Installation.(1) Position load terminal board assembly (6, figure 3-106) to install Iockwashers (5) and standoff (4).(2) Install plastic sheild (3), Iockwashers (2) and screws (1).(3) Connect electrical leads to load terminal baard assembly.3-86. CURRENT TRANSFORMER ASSEMBLIES.a. Removal.(1)(2)(3)(4)(5)(6)(7)Tag and disconnect electrical leads from transformer winding terminals.Tag generator leads and record their routing through transformer windows (noting polarity) as shownin figure 3-107; then disconnect and remove them.Remove nuts (1, figure 3-108), Iockwashers (2), screws (3) and current boost transformer (4).Do not remove screw and washer assemblies (5), flat washers (6) and mounting brackets (7) unlessinspection reveals damage and replacement is necessary.Remove screw and washer assemblies (8), flat washers (9) and instrumentation transformer (10).Remove nuts (11), screws (12), Iockwashers (13), and cross-current compensation transformer (14).Do not remove screw and washer assemblies (15), flat washers (16) and mounting brackets (17)unless inspection reveals damage and replacement is necessary.3-231

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!