10.07.2015 Views

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>ARMY</strong> TM 9-<strong>6115</strong>-<strong>464</strong>-<strong>34</strong><strong>AIR</strong> <strong>FORCE</strong> <strong>TO</strong> <strong>35C2</strong>-3-445-2NAVY NAVFAC P-8-624-<strong>34</strong>1-5. DESTRUCTION OF MATERIAL <strong>TO</strong> PREVENT ENEMY USE.Destruction of the generator set to prevent enemy use will be in accordance with the requirements of TM750-244-3 (Procedures for Destruction of Equipment to Prevent Enemy Use) for U.S. Army.1-6. SHIPMENT AND S<strong>TO</strong>RAGE.a. (F) Preparation for shipment and storage of the generator set for US Air Force will be in accordance with<strong>TO</strong> 35-1-4.b. (A) Shipment and storage for US Army and the US Marine Corps will be in accordance with TB740-97-2.1-7. EQUIPMENT IMPROVEMENT RECOMMENDATIONS (EIRs)a. (A) EIRs can and must be submitted by anyone who is aware of an unsatisfactory condition with theequipment design or use. It is not necessary to show a new design or list a better way to perform a procedure,just simply tell why the design is unfavorable or why the procedure is difficult. EIRs maybe submitted on SF368. Mail directly to US Army Avaition and Troop Command, ATTN: AMSAT-I-MDO, 4300 Goodfellow Blvd, St.Louis, MO 63120-1798.1-8. LEVELS OF MAINTENANCE.The user shall refer to the Maintenance Allocation Chart (MAC) of TM 9-<strong>6115</strong>-<strong>464</strong>-12 (appx B) for tasksand categories of maintenance to be performed.1-9. DESCRIPTION.Section Il. EQUIPMENT DESCRIPTION AND DATAThe generator set is a fully enclosed, self-contained, skid mounted, portable unit. It is equipped withcontrols, instruments, and accessories which enable it to be operated as a single unit or in parallel with two ormore units of the same size, class, and mode. In addition, the generator sets will accept and operate with fueland electric winterization kits, load bank kit, wheel mounting kit, automatic transfer panel kits, a remote controlbox, and an application kit. For a more detailed description of the generator sets, refer to the Operator and UnitMaintenance Manual. A more detailed description of specific components and assemblies is found in theapplicable maintenance paragraphs of this manual.1-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!