10.07.2015 Views

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

ARMY *TM 9-6115-464-34 AIR FORCE TO-35C2-3 ... - Igor Chudov

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>ARMY</strong> TM 9-<strong>6115</strong>-<strong>464</strong>-<strong>34</strong><strong>AIR</strong> <strong>FORCE</strong> <strong>TO</strong> <strong>35C2</strong>-3-445-2NAVY NAVFAC P-8-624-<strong>34</strong>5-21. LOAD BANK HOUSING.a. Removal. Refer to the Operator and Unit Maintenance Manual for load bank housing removalinstructions.b. Disassembly.(1) Remove control box assembly (paragraph 5-20),(2) Remove heater strips, thermostat and terminal board as outlined in the Operator and UnitMaintenance Manual.(3) Remove nut (1, figure 5-17), screw and captive washer assembly (2), and protective cap (3).(4) Remove nut (4), screw and captive washer assembly (5), top load bank wiring harness (7).(5) Remove split grommet (9), load bank wiring harness (6), and bottom load bank wiring harness (8)from housing assembly (10).c. Cleaning, lnspection, and Repair.(1) Clean housing in dry cleaning solvent (Federal Specification P-D-680) and dry with compressed air.(2) Refer to the Operator and Unit Maintenance Manual for wiring harness cleaning, inspection, andrepair procedures.(3) If the wiring harnesses have sustained damage and require repair or rebuild, refer to figures 5-18,5-19, or 5-20 as required, for layout, identification of material requirements and Appendix Areferences for detailed soldering and replacement procedures.(4) Inspect housing assembly for cracks, breaks, warping and other damage. Replace housing assemblyif damaged beyond repair.d. Assembly.(1) Position housing assembly (10, figure 5-17), to install bottom load bank wiring harness (8), andload bank wiring harness (6), with grommets (9).(2) Install top load bank wiring harness (7), screw and captive washer assembly (5), and nut (4).(3) Install protective cap (3), screw and captive washer assembly (2), and nut (1).(4) Install heater strips, thermostat and terminal board as outlined in the Operator and Unit MaintenanceManual.(5) Install control box assembly (paragraph 5-20).e. InstaIlation. Refer to the Operator and Unit Maintenance Manual for load bank housing installationinstructions.5-22. WIRING HARNESSES.a. Refer to the Operator and Unit Maintenance Manual for wiring harness removal, cleaning, inspection, andrepair procedures.b. If the wiring harness has sustained damage and requires repair or rebuild, refer to figure 5-21 or 5-22 forlayout, identification, and material requirements and Appendix A for detailed soldering and replacementprocedures.c. Refer to the Operator and Unit Maintenance Manual for wiring harness installation instructions.5-39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!