10.07.2015 Views

general information - Martin Nez

general information - Martin Nez

general information - Martin Nez

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CHASSIS 8-29• Set the handlebars so that its punch mark B aligns with themating surface of the left handlebar holder.• Tighten the handlebar clamp bolts.NOTE:First tighten the handlebar clamp bolts C (front ones) to thespecified torque. Handlebar clamp bolt: 23 N·m (2.3 kgf-m)• Install the front brake master cylinder. (8-63)• Insert the projection D of the right handlebar switch into holeof the handlebar.• Apply SUZUKI SUPER GREASE to the throttle cables andcable pulley. 99000-25010: SUZUKI SUPER GREASE “A”(or equivalent grease)• Apply a handle grip bond onto the left handlebar beforeinstalling the handlebar grip.39442-09D00: HANDLE GRIP BOND• Insert the projection E of the left handlebar switch box intothe hole of the handlebar.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!