13.07.2015 Views

Download complete manual - pdf - Xtreme Manufacturing

Download complete manual - pdf - Xtreme Manufacturing

Download complete manual - pdf - Xtreme Manufacturing

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

AFTER FIRST 50 HOURS OF OPERATIONREQUIREMENT COMMENTS CHECK-OFFChange engine oil and filters Check air filter. Replace if necessary. Replace fuel filter Check engine hoses and connections for leaks, damage, and tightness Check radiator hoses for leaks, damage, and tightness Check engine electrical cables, leads, and connections for damage andtightnessCheck for oil and coolant leaks Check condition and tension of drive belts. Use tensiometer to check belttension.Lubricate front and rear driveshaft grease fittings Lubricate front and rear axle grease fittings Change differential oil Change wheel-end oil Check wheel lug nuts torqued to 380-420 ft-lbs Lubricate boom pivot point grease fittings Lubricate front and rear axle cylinder pivot point grease fittings Lubricate left and right outrigger pivot point (1245/1254/1267/2050) greasefittingsLubricate boom roller grease fittings and chains Replace hydraulic return line filter Replace transmission filter and top off fluid A-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!