13.07.2015 Views

Download complete manual - pdf - Xtreme Manufacturing

Download complete manual - pdf - Xtreme Manufacturing

Download complete manual - pdf - Xtreme Manufacturing

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Maintenance ScheduleXR620/621/842/1045/1245/1254/1267/1534/2050/3034Section 3Maintenance Schedule3-1 ESTABLISHING A PREVENTIVE MAINTENANCE PROGRAMAn hour meter (Figure 3-1) is installed in the operator control panel. The hour meter displays elapsedengine operating hours and has a total readout of 9,999.9 hours. Use the hour meter and the tablescontained in this chapter to establish a comprehensive preventive maintenance program for the forklift.The same preventive maintenance tables are included in the Appendix, Maintenance Forms and SafetyTags, for the purpose of copying and reuse.Refer to Tables 3-1 through 3-9 for specific maintenance requirements, intervals, and a reference to thespecific paragraph in this Owner's Service Manual that provides the maintenance instructions for the task.Figure 3-1. Forklift Hour MeterTable 3-1. Preventive Maintenance – After First 50 Hours of OperationMaintenance RequirementRefer toPara.Change engine oil 5-8Replace engine oil filters 5-9Check air filter. Replace if necessary. 5-14Replace fuel filter 5-10Check engine hoses and connections for leaks, damage, and tightness 5-17Check radiator hoses for leaks, damage, and tightness 5-18Check engine electrical cables, leads, and connections for damage and tightness 5-19Check for oil and coolant leaks 5-4Check condition and tension of drive belts. Use tensiometer to check belt tension. 5-15Lubricate front and rear driveshaft grease fittings 6-4Service Manual Rev 01 – 05/10 3-1P/N 24933-000

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!