13.07.2015 Views

Download complete manual - pdf - Xtreme Manufacturing

Download complete manual - pdf - Xtreme Manufacturing

Download complete manual - pdf - Xtreme Manufacturing

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

AFTER EVERY 50 HOURS OF OPERATIONREQUIREMENT 50 100 150 200 250 300 350 400 450 500Lubricate boom pivot point grease fittings Lubricate front and rear axle cylinder pivot point grease fittings Lubricate left and right outrigger pivot point grease fittings(1245/1254/1267/2050) AFTER EVERY 250 HOURS OF OPERATIONREQUIREMENT 250 500 750 1000 1250 1500 1750 2000Comply with 50-Hour Maintenance Requirements Change engine oil and filters Check air filter. Replace if necessary. Check tension and condition of drive belts. Use tensiometer to check belttension. Lubricate front and rear driveshaft grease fittings Lubricate front and rear axle grease fittingsCheck differential oil level Check wheel-end oil level Check boom chain tension. Adjust if necessary. Inspect boom rollers and slide blocks for condition and tightness Lubricate boom roller grease fittings and chains A-4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!