1410<br />

ELECIRIC POW/ER<br />

Estintes for costs of restoration of the electric power subsector under<br />

the National Recovery Plan are based on known requireiTents for new generating<br />

capacity; on the CEL proposals in<br />

the currently approved investment plan of<br />

MIPLAN; on estimates of the transmission system to be repaired as derived from<br />

s<br />

the _Lj _._rge tue l n i.A___SServm Db As5i ent (1990 UPDATE), and<br />

estiiintes fo , c r:,t of rebullding distribution and subtransmission as<br />

submitted. Detailed rebuilding costs were available for<br />

DEUSEM, CLES, and CLESA.<br />

were rmede on basis of costs of the other<br />

coverage of the various systems,<br />

and subtransmission lines.<br />

CEL distribution,<br />

DBata was not available foi CAESS, but projections<br />

systems, the areas and location of<br />

and their relative lengths of distribution<br />

Such costs from extrapolated estirmated are subject to refinement to more<br />

precise figures in the future.<br />

Complementary planning and construction<br />

costs are compiled from those<br />

projects in the current investment plan which were not included In Phases I<br />

and II, plus an estinate of the cost of steam generating capacity which would<br />

be required to replace the loss of hydroelectric generation due to low river<br />

flow in dry years.<br />

1he raw data from CEL upon<br />

which estimates were based follow. Tables<br />

from Ptit) ic Investment PriortiLes andL elaibcal Assistance (April, 1991) of<br />

MIPLAN are included in Appendix 0.