IV. WATER SUPPLY AND SEWAGE<br />

221<br />

Table 0.5: Water Supply and Sewage Ongoing and Proposed Investment Progran,<br />

1990-1994 (MIPLAN April 1991)<br />

Projects with Financing<br />

US$ Millions Executing Donor<br />

Agency<br />

I. San Salvador Metropolitan 75.8 ANDA IDB<br />

Rio Lempa Project (813-SF/ES/IDB)<br />

2. Emergency Loan (801-SF/ES/IDB) 0.5 ANDA IDB<br />

3. Pilot Water Project 5.2 ANDA USAID<br />

4. Water Program (519-320) 40.0 ANUSAID<br />

5. Loan Conmunity Program 0.8 ANDA USAID<br />

6. 3rd. Rural Program (PLANSABAR) 10.6 MI1 IDB<br />

7. Low Cost Rural Program 2.2 VW UNICEF<br />

Subtotal<br />

Projects W/O Financing<br />

135.1<br />

8. Metropolitan San Salvador<br />

Cost overruns (Loan 813-SF/ES/IDB)<br />

9. Fquipment Rehabilitation<br />

18.0<br />

4.0<br />

ANDA<br />

ANDA-­<br />

--<br />

and Metering (ANDA)<br />

10. Central Zone Project<br />

11. Emergency Pipe and Equipment<br />

Rehabilitation<br />

12. Corinto-San Martin<br />

13. Metropolitan San Salvador<br />

Second Phase<br />

10.9<br />

12.0<br />

10.8<br />

23.6<br />

ANDA<br />

ANDA<br />

ANDA<br />

ANDA<br />

KFWw<br />

--<br />

-­<br />

IDB<br />

Subtotal 79.3 ANDA<br />

Grand Total 214.9 --<br />

Average Annual Investment 42.9<br />

Source: ANDA, &M<br />

* Under Negotiation.<br />