ANEXO A<br />

PLAN DE EOUIPAMIENTO DEL SISTEMA DE GENERACION Pig. I de<br />

PERIODO 1992 - 2005<br />

DEMANDA INTERMEDIA<br />

POTENCIA<br />

POTENCIA EFECTIVA<br />

ARO CAN. PRoY=To EvA CUTAWD<br />

1992 2 B.P. Berlin 10.0 575.7<br />

1993 1 B.P. Berlin 5.0 580.7<br />

1994 2 Turbina a Gas 37.5 MW 71.0 651.7<br />

I B;:P. Chipilapa<br />

1995 1 Turbina Gas 37.5 MW 33.0 684.7<br />

1996 2 C. Geotgrmica Berln 20 MW 61.0 745.7<br />

Estab. Ahuachgpn 21 MW<br />

1997 1 C. Geotermica BerlIn 20 MW 27.0 772.7<br />

1 C. Geo.6rmica Chipilapa 20 MW<br />

-1 Soyapango Unidad 1 -13.0<br />

1998 -1 Soyapango ;Unidad 2 -13.0 213.0 759.7<br />

1999 1 C. Gotgrmica San Vicente 20 MW 124.0 883.7<br />

1 Expansi6n 5 de Noviembre 120 MW<br />

-1 Soyapango Unidad 3 -.16 MW<br />

2000 1 C. Geoeirmica Coatepeque 20.MW 70.0 953.7<br />

1 C. San Marcos Lempa I y 2 80 Mw<br />

-1 Unidad Acajutlall -30 MW<br />

2001 1 Unidad Bunker 75 MW 42.0 995.7<br />

-1 AcaJucla-Unidad 2 -33 MW<br />

2002 1 Utlidad Bunker 75 MW 75.0 1070.7<br />

2003 1 Turbina:Gas 37.5 MW 33.0 1103.7<br />

2004 1 Unidad Bunker 75.MW 115.0 1210.7<br />

1 San Marcos Unidad 3 40 MW<br />

2005 1 Unidad Bunker 75 MW 57.0 1275.7<br />

-1 Turbina Gas San Miguel -18 MW<br />