Water and sanitation ccverage is still quite limited, particularly in the<br />

rural areas. In [989, water sewage coverages in the rural areas were<br />

estimated at 19% and 36%, respectively, nearly one-half of the national<br />

average of 49% and 60%. To reach a national coverage of 75% in water and<br />

sanitation by the turn of the century, El Salvador would need to invest some<br />

USS40 million a year, a large share of which in the rural areas (ANDA).<br />

NOTE: ANDA correctly states the need for a water supply and sewage sector<br />

investment of at least $40 million per year. In fact, this estimate may be<br />

low by a factor of 2 if all the people were eventually to have reasonably good<br />

access<br />

to high quality potable water and waste water disposal. Thus,<br />

requirements in both the MIPLAN investment priorities list above and the<br />

National Recovery Plan apparenntly were established more on the base of<br />

existing capabilities of the sector institutions than by the needs of the<br />

people nation wide. The needs of the people in the rest of the country should<br />

be addressed with the same priorities as those of San Salvador.<br />

In any event, the needs set out in the National Recovery Plan are in addition<br />

to those in the investment priorities list: $44.7 million.<br />

V. ELECTRIC PER<br />

Table 0.6: Proposed Investment Program, 1991-94 (US$ thousands)<br />

(MIPLAN April 1991)<br />

Projects Possible 1991<br />

Financing<br />

Source<br />

1992 1993 1994 Totall<br />

1. Protection of the Cerr6n GEL<br />

Grande's Central against<br />

74.2<br />

0.0 0.0 0.0 74.2<br />

landslides<br />

2. Berlin's Geothermic CABEI 375.1 21,254.0 26,453.8 29,847.8 77,930.7<br />

Field (First Unit)<br />

3. Rural Electrification<br />

Project CEL/NECA [I<br />

4. Reconstruction and<br />

voltage change of the<br />

Sensuntepeque<br />

USAID<br />

CEL<br />

1,818.9<br />

68.0<br />

0.0<br />

0.0<br />

0.0<br />

0.0<br />

0.0<br />

0.0<br />

1,818.9<br />

69.0<br />

distribution network<br />

5. Rehabilitation of the 5<br />

5 of November<br />

374.2 2,408.5 1,595.4 0.0 4,378.1<br />

Hydroelectric Central<br />

6. Increase the capacity of<br />

the Nuevo Cuscatl6.n<br />

0.0 1,501.0 0.0 0.0 1,501.q<br />

Substation<br />

7. Increase the capacity of<br />

the Sonsonate Substation<br />

0.0 1,318.0 0.0 0.0 1,318.<br />

... continued ...<br />