UBCACION<br />

DISTRIBUIDORA ELECTRICA DE USULUTAN, SOCIEDAD DE ECONOMIA MIXTA<br />

TRANSPORAADORES<br />

San Francisco Javier<br />

PLAN DE RECONSTRUCTON EN AREAS CONFLICTIVAS<br />

DE DISTRIBUCION<br />

FECHA<br />

OCURRENCIA VOLTAJE<br />

Enero/NoP/82 7.6/13.2 KV.<br />

CAPACIDAD<br />

50 KVA.<br />

37.5 KVA.<br />

25 KVA.<br />

San Agustin Enero/Nov/82 7.6/13.2 KV. 37.5 KVA.<br />

CANTIDAD<br />

3<br />

3<br />

5<br />

15 KVA. 5<br />

25 KVA.<br />

15 KVA.<br />

10 KVA.<br />

Cantdn Cuche de Monte Mayo/81/Jun/84 7.6/13.2 KV. 25 KVA.<br />

Usulutdn, 1 de Agosto de 1991.<br />

MEHIYGA.<br />

15 KVA.<br />

10 KVA.<br />

2<br />

4<br />

6<br />

3<br />

2<br />

5<br />

4<br />

SUB TOTAL<br />

SUB TOTAL<br />

SUB-TOTAL<br />

COSTO APROXIAL4DO<br />

DE PEPOS[C[ON<br />

30.000.00<br />

" 25.000.00<br />

" 37.500.00<br />

" 31.500.00<br />

124.500.00<br />

15.000.00<br />

" 30.000.00<br />

" 37.800.00<br />

" 16.500.00<br />

"<br />

"<br />

101.300.00<br />

15.000.00<br />

31.500.00<br />

22.0.00<br />

68.500.00<br />

T 0 T A L ¢ 294.300.00<br />