104<<strong>br</strong> />

6.2.3 Valores Comparados do BPD – Análise Amostral<<strong>br</strong> />

Considerando os valores médios obtidos no período anterior e posterior à<<strong>br</strong> />

<strong>implementação</strong> do Sistema Global de Manufatura, referente ao Desdo<strong>br</strong>amento do<<strong>br</strong> />

Plano de Negócios, evidenciam-se ganhos significativos. Conforme demonstrado <strong>na</strong><<strong>br</strong> />

Tabela 13 pode-se observar as melhorias obti<strong>da</strong>s <strong>na</strong>s cinco categorias do BPD <strong>com</strong> a<<strong>br</strong> />

utilização de dez indicadores escolhidos para a análise amostral.<<strong>br</strong> />

Tabela 13 – Antes e Depois <strong>da</strong> Implementação do GMS/BPD (2000 x 2003)<<strong>br</strong> />

CATEGORIAS DO<<strong>br</strong> />

BPD<<strong>br</strong> />

DES. PESSOAS CUSTOS CAP. RESPOSTA QUALIDADE SEGURANÇA<<strong>br</strong> />

INDICADORES ANTES APÓS<<strong>br</strong> />

VARIAÇÃO<<strong>br</strong> />

PERCENTUAL<<strong>br</strong> />

NA 0,63 0,13 -79,4<<strong>br</strong> />

(nº de acidentes)<<strong>br</strong> />

NEAR MISS 21,38 42,50 +98,8<<strong>br</strong> />

GCA 0,77 0,55 -28,6<<strong>br</strong> />

(DPV)<<strong>br</strong> />

DIRECT RUN 93,84 93,98 +0,2<<strong>br</strong> />

( % OK )<<strong>br</strong> />

PRODUTIVIDADE 188,56 224,25 +18,9<<strong>br</strong> />

(UN / HOM X MÊS)<<strong>br</strong> />

DOWN TIME 7,36 4,79 -34,9<<strong>br</strong> />

( % Para<strong>da</strong>s )<<strong>br</strong> />

MAT. DIRETO 68,88 53,25 -22,7<<strong>br</strong> />

( R$ / uni<strong>da</strong>de )<<strong>br</strong> />

SCRAP 0,57 0,32 -43,9<<strong>br</strong> />

( R$ / uni<strong>da</strong>de )<<strong>br</strong> />

ABSENTEÍSMO 1,83 1,34 -26,8<<strong>br</strong> />

( % )<<strong>br</strong> />

PMC 7,63 15,13 +98,3<<strong>br</strong> />

SITUAÇÃO<<strong>br</strong> />

MELHOROU<<strong>br</strong> />

MELHOROU<<strong>br</strong> />

MELHOROU<<strong>br</strong> />

MELHOROU<<strong>br</strong> />

MELHOROU<<strong>br</strong> />

MELHOROU<<strong>br</strong> />

MELHOROU<<strong>br</strong> />

MELHOROU<<strong>br</strong> />

MELHOROU<<strong>br</strong> />

MELHOROU<<strong>br</strong> />

Para uma visualização e <strong>com</strong>paração mais clara entre os dois períodos de<<strong>br</strong> />

análise, ou seja, antes e depois <strong>da</strong> <strong>implementação</strong> do Sistema Global de Manufatura,<<strong>br</strong> />

referente ao novo sistema de gerenciamento, é que os gráficos ilustrados e<<strong>br</strong> />

apresentados a seguir foram elaborados.