07.04.2013 Views

DELOREAN WORKSHOP MANUAL - Free

DELOREAN WORKSHOP MANUAL - Free

DELOREAN WORKSHOP MANUAL - Free

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

=*"n Heating<br />

F*X1<br />

ps*l<br />

and Air Conditioning N .07:01<br />

EVACUATING - DEHYDRATING AND CHARGING SYSTEM<br />

1. Reconnect white hose to Dial-a-charge.<br />

2. Reconnect hoses to compressor — Schrader<br />

valves out.<br />

3. Open low side valve — open high side valves.<br />

Valves on Oial-a-charge fully closed.<br />

4. Switch on vacuum pump.<br />

5. Open main vacuum valve.<br />

Allow vacuum pump to operate till 275 microns<br />

or below are shown on thermister gauge.<br />

Note:<br />

At this point the charging cylinder may be filled<br />

with correct quantity of refrigerant — See<br />

section N:06:01.<br />

Close the main vacuum valve for 5 minutes. If the<br />

700 micron bulb does not light up the system is not<br />

leaking. Proceed to charge system.<br />

If the 700 micron light operates but none higher<br />

resume vacuum for a further 5 minutes — retest<br />

vacuum.<br />

If all the lights come on the system is leaking.<br />

Proceed to leak detection Section N:05:01.<br />

1. Check that all taps on the refrigerant station<br />

are closed.<br />

2. Open the "Refrigerant out" tap on the<br />

charging cylinder.<br />

3. Open the high pressure (Red) tap and allow<br />

14 lb. refrigerant to enter system. Close the<br />

high pressure (Red) tap.<br />

Close outlet valve on D.A.C.<br />

A high volume fan can be placed to blow the air<br />

over the condenser. This will help to keep the<br />

refrigerant in a liquid form and therefore cut down<br />

the charging time.<br />

Disconnect and bridge LP switch at accumulator.<br />

Hand brake on — transmission in neutral.<br />

Run engine at idle speed.<br />

Match D.A.C. shield to pressure gauge.<br />

Open the low pressure (Blue) tap on station. Open<br />

outlet valve on Dial-a-charge slowly.<br />

Allow another 2 lbs. of R - 12 to enter system. This<br />

amount gives the total gas charge of 2.5 lbs.<br />

TOTAL R-12 CHARGE<br />

2.5 lbs.<br />

1130 gms.<br />

When the full charge has entered the system<br />

(noted by charging cylinder sight glass) close the<br />

D.A.C. outlet tap by turning clockwise.<br />

Close blue gauge valve.<br />

Refit Schrader valves as previously stated, remove<br />

the high and low pressure pipes from the core<br />

access valves and screw them onto the storage<br />

bracket.<br />

Remove the valve access core removers and refit<br />

the dust caps to the valve removers and the<br />

Schrader valve.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!