07.04.2013 Views

DELOREAN WORKSHOP MANUAL - Free

DELOREAN WORKSHOP MANUAL - Free

DELOREAN WORKSHOP MANUAL - Free

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

N:10:12 Heating and Air Conditioning<br />

REPLACING COMPRESSOR<br />

Oil Level Check<br />

When replacing a Sankyo compressor containing<br />

uncontaminated oil with a new Sankyo compressor,<br />

use the following procedure:<br />

Step 1 — Drain the oil from the new compressor.<br />

Step 2 - Drain and measure the oil from the old<br />

compressor.<br />

Step 3 — Measure new oil equal to the amount<br />

drained from the old compressor. Add one fluid<br />

ounce (30 cc) of new oil to this amount and use it<br />

to refill the new compressor.<br />

The DMC compressors are high-speed compressors.<br />

Satisfactory operation depends on<br />

sufficient lubrication. Too much oil decreases<br />

cooling efficiency.<br />

Installation Tips<br />

Trouble-free installation and operation of a Sankyo<br />

compressor is directly attributable to:<br />

• Correct pulley alignment.<br />

• Accurate fit of mounting bracket surfaces to the<br />

engine and compressor mounting ears.<br />

• Correct torque of all securing bolts and nuts.<br />

• Correct tension of the drive belt.<br />

Never operate the compressor at fast speed or for a<br />

prolonged time with insufficient system refrigerant<br />

charge.<br />

Flush Procedure<br />

Flushing of a system is advisable:<br />

• When replacing a compressor.<br />

• When a system has been contaminated.<br />

Purging with R - 12 vapor or other dry vapor under<br />

pressure is inadequate cleansing Only<br />

recommended flushing materials should be used.<br />

Some satisfactory materials con ining<br />

refrigerants, such as R — 11 as a liquid : rising<br />

agent with R — 12 vapor propellant, afe a able.<br />

The following procedure is a method using R - 11.<br />

Note:<br />

When flushing with R - 11, do not allow it to enter<br />

the compressor.<br />

Step 1 — Disconnect both hose connections to<br />

the compressor.<br />

Step 2 — Remove and discard the Receiver-Drier.<br />

Step 3 — Connect the R-11 container at the<br />

discharge hose connection and allow<br />

approximately one pound of R-11 to enter the<br />

discharge side of the condenser.<br />

Step 4 — Then connect a dry vapor container at<br />

that same point, preferably a dry nitrogen with<br />

pressure set between 100 and 250 psig. Allow<br />

pressurized vapor to enter until all R-11 liquid is<br />

purged out the inlet to receiver-drier hose<br />

connections.<br />

Step 5 — Cap both connections.<br />

Step 6 — Remove expansion valve and clean.<br />

Step 7 — Using the same procedure above, flush<br />

and purge the liquid hose from the receiver-drier to<br />

the expansion valve and suction hose and<br />

evaporator.<br />

j<br />

""!

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!