25.06.2013 Views

NUREG-1537, Part 2 - NRC

NUREG-1537, Part 2 - NRC

NUREG-1537, Part 2 - NRC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

-.... - . INSTRUMENTATION AND CONTROL SYSTEMS<br />

Reactor operation should be prevented and not authorized without use of a<br />

key or combination input at the control console.<br />

Review Procedures<br />

The reviewer should coordinate the review of this section with all other applicable<br />

chapters of the SAR because the control console and other display instruments in<br />

the reactor control room could be linked to numerous systems and subsystems in<br />

the reactor facility. The reviewer should compare the design bases and functional<br />

requirements of other reactor systems with those for the control console<br />

equipment. The reviewer should also compare the design of the console system<br />

-with the acceptance criteria. The reviewer should study the arrangement of<br />

parameter displays, control devices, and the planned operator station to determine<br />

whether the operator can quickly understand information and take proper action.<br />

The reviewer should obtain the assistance of experts in the I&C Branch to review<br />

computer systems. The reviewer should note the discussion in the format and<br />

content guide about digital operator information display systems or operator aids.<br />

Evaluation Findings<br />

This section of the SAR should contain sufficient information to support the<br />

following types of conclusions, which will be included in the staffs safety<br />

evaluation report:<br />

The applicant has shown that all nuclear and process parameters important<br />

to safe and effective operation of the (insert name offacility) non-power<br />

reactor will be displayed at the control console. The display devices for<br />

these parameters are easily understood and readily observable by an<br />

operator positioned at the reactor controls. The control console design and<br />

operator interface are sufficient to promote safe reactor operation.<br />

d The output instruments and the controls in the control console have been<br />

designed to provide for checking operability, inserting test signals,<br />

performing calibrations, and verifying trip settings. The availability and use<br />

of these features will ensure that the console devices and subsystens will<br />

operate as designed.<br />

* - The annunciator and alarm panels on the control console give assurance of<br />

the operability of systems important to adequate and safe reactor operation,<br />

even if the console does not include a parameter display<br />

* The locking system on the control console reasonably.ensures that the<br />

reactor facility will not be operated by unauthorized personnel.<br />

REV 0,2196 7-19 STANDARD REVIEW PLAN<br />

REV 0, 2196 -1 7-19 STANDARD REVIWPLAN

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!