CHAPTER 7<br />

7.7 Radiation Monitoring Systems<br />

Areas of Review<br />

In this section of the SAR, the applicant should address all equipment, devices, and<br />

systems used for monitoring or measuring radiation intensities or radioactivity,<br />

except for nuclear instruments. Information in this section should be reviewed in<br />

close coordination with those sections of Chapter 11, Radiation Protection<br />

Program and Waste Management," that discuss the use of radiation-monitoring<br />

systems to assess, evaluate, or control personnel or environmental radiological<br />

exposures. Chapter 11 should include sufficient information about the radiationmonitoring<br />

systems to support confident use of the exposure and dose results and<br />

this section should detail the operating principles, designs, and functional<br />

performance of the I&C aspects of the system. Radiation measurements at a<br />

reactor facility may also be used for reactor diagnostic or safety purposes, and the<br />

applicable equipment should be discussed in this section. Examples of such<br />

finctions may include reactor coolant level, coolant radioactivity, fuel inventory<br />

measurements for self-protection, confinement or containment initiation, and<br />

experimental measurements.<br />

The reviewer should evaluate radiation detectors and sampling equipment; signal<br />

processing equipment; computer hardware and software that controls sampling,<br />

detection, signal processing and logic; power supplies; and actuation systems that<br />

accomplish a function for the system. In determining if the I&C systems are<br />

designed to accomplish the radiation measurement functions, the reviewer should<br />

evaluate the following:<br />

* design bases, criteria, and guidelines used to design the system<br />

* descriptive information including functional operation, instrument logic and<br />

schematic diagrams<br />

* analysis of the adequacy of the design to perform the stated function or<br />

purpose of the systems and conformance to the design bases, criteria, and<br />

guidelines used<br />

* psroposed trip, annunciation, or alarm setpoints, time delays, accuracy<br />

requirements, and actuated equipment response to verify that they are<br />

consistent with applicable analyses and limiting conditions for operation in<br />

the SAR<br />

* coordination with review of other applicable SAR chapters to assess the<br />

suitability of the monitored parameters for accomplishing the purposes<br />

<strong>NUREG</strong>-<strong>1537</strong>,PART2 7-20 REV 0, 2,6<br />