CONDUCTOFOPsnEPAIoNS<br />

* The applicant should have plans for receiving fuel, handling and performing<br />

quality assurance checks on the new fuel, and loading fuel using a critical<br />

expeinment.<br />

* The critical mass (number of fuel elements) should be approximately<br />

known and should be exactly determined by a systematic approach to a<br />

critical experiment.<br />

* Neutron detectors of high sensitivity and reliability may be used to<br />

supplement the operational instrumentation during subcritical neutron<br />

multiplication measurements.<br />

* Measurements should be planned to measure operational reactor physics<br />

parameters, such as shutdown reactivity (to confirm shutdown margin),<br />

reactivity feedback coefficients, differential and integral control rod worths,<br />

power level monitors, scram and interlock functions, fuel heat removal, and<br />

related thermal-hydraulic parameters.<br />

* Measured and predicted reactor physics parameters should be compared<br />

and the results of the comparisons should be evaluated against<br />

preestablished acceptance criteria.<br />

* The control rods should be calibrated and excess reactivity should be<br />

loaded systematically, in order to obtain accurate values..<br />

* Thermal powerofthe reactor should be calibrated acceptably and<br />

accurately to ensure compliance with the licensed power level limits and<br />

any other license conditions, such as pulse characteristics.<br />

* Area and effluent radiation surveys should be conducted to confirm<br />

predictions of the radiological status of the facility.<br />

* All instruments and components should be tested before routine operations<br />

begin.<br />

* Other systems dissed in the startup plan should be tested and found to<br />

be operational before routine operations begin. - -<br />

Revew Procedues<br />

The reviewer should compare the startup plan submitted by the applicant with<br />

startup reports, tecbhical specifications, other license conditions, startup plans, and<br />

final reports from other similar reactor facilities. The reviewer should verify that<br />

key facility parameters and conditions that are calculated and used in the<br />

REv. 0, 2/96 12-15 STAARD REVIEW PLAN