* assumed inventory of fission products and source of decay heat<br />

_ THE FArHM<br />

* assumed releases of radioactive effluents to the unrestricted environment<br />

The reviewer should also evaluate the operating characteristics and schedules in an<br />

application for license renewal for significant changes and for consistency with the<br />

proposed technical specifications.<br />

Acepkawce Criteria<br />

The acceptance criteria for the applicant's summary of operations include the<br />

following:<br />

* The applicant should demonstrate the consistency of proposed operations<br />

with the assumptions in later chapters of the SAR, including the effect on<br />

reactor integrity and potential radiological exposures.<br />

* The applicant should demonstrate that the proposed reactor operation was<br />

conservatively considered in the design and safety analyses.-<br />

* The proposed operations for license renewal should be consistent with the<br />

assumptions in later chapters of the SAR.<br />

Review Procedures<br />

Although <strong>NRC</strong> has not issued criteria for evaluating proposed operations, the<br />

reviewer should compare proposed operations with the cumrent operations of any<br />

similar ficilifies. The reviewer should verify that proposed operations are<br />

summarized and should compare them with similar facilities for initial licensing, or<br />

with previous operations if the application is for license renewal. For license<br />

renewal, the reviewer should solicit evaluations by <strong>NRC</strong> inspectors from the<br />

appropriate regional office. Evaluations by <strong>NRC</strong> regional inspectors and<br />

evaluations based on the annual report from the facility should provide additional<br />

verification that the applicant can operate the facility as specified mi the SAR; If<br />

there are limitation's on operation of the reactor, the reviewer should verify that<br />

they are represented as license conditions.<br />

Eialuatn FiRings<br />

This section of the SAR should contain sufficient information to support the<br />

following type of conclusion, which will be included in the staffs safety evaluation<br />

report: -.<br />

REv.O,2196 . . 1-11 I-1 1 .<br />

STANDARD REVIEW PLi.N<br />

-''STANDARDREvmwPLAN<br />

REV .V9