25.06.2013 Views

NUREG-1537, Part 2 - NRC

NUREG-1537, Part 2 - NRC

NUREG-1537, Part 2 - NRC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Standard Review Plan and Acceptance Criteria<br />

for IEU to LEU Conversion<br />

1 GENERAL DESCRIPTION OF THE FACILITY<br />

1.1 Introduction<br />

The reviewer should verify that the introduction contains a brief overview of the<br />

plans for conversion of the reactor from lIEU to LEU fuel, and that it s arize<br />

the physical nuclear, and operational characteristics of the facility with the LEU<br />

fuel. It should provide reference to where in the SAR changes are discussed.<br />

Additionally, it should provide comparisons and references to the exsting reactor<br />

described in the lIEU SAR. The reviewer should verify that Sections 1.1 through<br />

1.5 establish an outline of the primaiy considerations for conversion to LEU fuel.<br />

1.2 Summary and Conclusions of Principal Safety<br />

Considerations<br />

The reviewer should confirm that this' section briefly discusses all significant issues<br />

that were considered in the plansandd designs for converting the reactor to LEU .<br />

fuel. All issues with safely significance should be emphasized, especially if any<br />

margins in the safety analysis would be decreased.<br />

Changes in the safety analyses should be discussed briefly, with references to the<br />

sections in which the detailed analyses are presented and in which the HEU- and<br />

LEU-fueled reactor operating characteristics are directly compared.<br />

1.3 Summary of Reactor Facility Changes<br />

The reviewer should confirm that this section summarizes any proposed changes to<br />

the site and the reactor faciity for the convsion to LEU fuel. Both the HEU and<br />

the LEU fuel should be briefly described and compared. References should be<br />

provided for the detailed fuel design, performance discussions, and other<br />

significant documents. If the proposed LEU fuel has been reviewed and evauted<br />

by <strong>NRC</strong>, the acceptance documents should be referenced (e.g., <strong>NUREG</strong>-1281,<br />

-1282, or -1313). The reviewer should verify that this brief discussion explains<br />

why the proposed LEU fuel is appropriate for the subject reactor and that the<br />

discussion addresses other proposed changes to the reactor and states why the<br />

change's are required by the f1uel conversion.<br />

REV.~~~~<br />

~ ~ 0,16ISADR EIWPA<br />

REV. 0,2196 I STAkM"MREviEwPLM

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!