04.07.2013 Views

The Gas Vans: A Critical Investigation - Holocaust Handbooks

The Gas Vans: A Critical Investigation - Holocaust Handbooks

The Gas Vans: A Critical Investigation - Holocaust Handbooks

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

306 SANTIAGO ALVAREZ, THE GAS VANS<br />

Translation & Remarks<br />

Imperial Security Main Office Berlin, the 27th of April 1942.<br />

II D 3 a (9) Bo. 668/42-121.<br />

1.) Reg.[istration]: under B.No. 1737/41, enter remark.<br />

2.) Note:<br />

Re.: Fast unloading device for the special vehicles.<br />

<strong>The</strong> special vehicle’s coachworks have a length of 5800 mm<br />

and a height of 1700mm. <strong>The</strong> net weight of the coachworks is 1600 kg<br />

each, while the loading weight is 4500 kg.<br />

Unloading is said to occur fast and as automatic as possible.<br />

In order to achieve this, the coachwork or a second floor is to be made<br />

tiltable. Unloading may also be achieved by means of an extractable<br />

grate.<br />

<strong>The</strong> below unloading options are to be assessed as to their<br />

functionality.<br />

a) Tilting mechanism for coachwork<br />

For unloading the coachwork needs to be tilted by 30 – 35°. A<br />

hydraulic tipper with 5 – 7 tons capacity is needed to lift the gross<br />

weight (1600 + 4500 kg). It has a construction height of 650 mm and a<br />

lifting height of 900 mm.<br />

Mounting a tipper ought to be considered as inexpedient for<br />

the following reasons:<br />

<strong>The</strong> floor of the coachwork needs to be reinforced and<br />

equipped with a tipper frame (loss of payload).<br />

In order to save construction height, it would be more expedient<br />

to mount twin tippers at the chassis girders. Such tippers are currently<br />

unavailable. <strong>The</strong> hydraulic single pillar tipper mentioned above<br />

has to be mounted on the reinforced traverse so high that it does not get<br />

in contact with the vibrating cardan shaft. Due to this mounting and due<br />

to adding the tipper frame, the coachwork will be lifted by at least 200<br />

mm. However, lifting the vehicle coachwork is impermissible, because<br />

this would exceed the railroad loading profile; except the interior space<br />

is reduced [in height]. But the interior already loses 150 mm in headroom<br />

due to the reinforcement of the floor.<br />

Delivery time for the one pillar tippers is ½ to 1 year.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!