23.03.2014 Views

Process Unit 73 LF - Knick

Process Unit 73 LF - Knick

Process Unit 73 LF - Knick

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Cleaning:<br />

The contact ”cleaning” is closed for the (user<br />

defined) duration of cleaning.<br />

<br />

Second Rinsing:<br />

The contact ”rinsing” is closed for the (user defined)<br />

duration of second rinsing.<br />

<br />

Wait Position:<br />

If current input has been set as control input,<br />

the probe remains in wait position as long as<br />

the start current of 10 to 20 mA is applied to the<br />

current input.<br />

Wait position can only be controlled via the current<br />

input. If current input has been set as signal input,<br />

wait position is omitted.<br />

<br />

Measurement Lead Time:<br />

The contact ”probe” is deactivated.<br />

Now, the user defined waiting time until rinsing<br />

cycle is terminated starts running.<br />

After expiration, ”functional check” will be<br />

turned off.<br />

If you have set one of these steps to 0000 s, it is<br />

omitted completely.<br />

Pressing during the rinsing cycle displays<br />

the measured value for approx. 5 s.<br />

Capabilities 9–45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!