23.03.2014 Views

Process Unit 73 LF - Knick

Process Unit 73 LF - Knick

Process Unit 73 LF - Knick

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Process</strong> <strong>Unit</strong> <strong>73</strong> <strong>LF</strong><br />

OUTP1 output current 1<br />

OUTP2 output current 2<br />

(only with option 350)<br />

CTL–Y controller output<br />

(only with option 353)<br />

TIME time<br />

DATE date<br />

Alarm Messages<br />

If the user defined limits (e.g. of measured conductivity)<br />

are exceeded for warning message<br />

(”maintenance required”) or failure message,<br />

”WARN” or ”FAIL” will appear in the lower left corner<br />

of the display.<br />

The measurement display flashes.<br />

The corresponding NAMUR contacts are active.<br />

Active messages are listed in the message list of<br />

the Diagnostics menu. (See page 3–2.)<br />

For setting the warning and failure message limits,<br />

refer to chapter 9, page 9–28.<br />

Limit Contacts Active<br />

If the defined limit values are exceeded, e.g. for<br />

conductivity, ”L1” and/or ”L2” will appear in the upper<br />

right corner of the display.<br />

Limit contacts L1 and/or L2 are active.<br />

During a sample calibration, the ”L1/L2” display is<br />

covered by ”Sample”!<br />

In remote status during interface operation, the<br />

”L1/L2” display is covered by ”Remote”!<br />

The limit value settings are listed under ”Measurement<br />

Data” in the Diagnostics menu. (See page<br />

3–2.)<br />

For setting the limit values, refer to chapter 9,<br />

page 9–30.<br />

2–2 Operation

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!