23.03.2014 Views

Process Unit 73 LF - Knick

Process Unit 73 LF - Knick

Process Unit 73 LF - Knick

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Safety Information<br />

Be sure to read and observe the following requirements!<br />

Before connecting the instrument to mains, make sure that the mains voltage corresponds<br />

to the voltage rating given on the rating plate.<br />

Opening the instrument exposes live parts. Therefore, the instrument shall not be<br />

opened. If repair should be required, return the instrument to our factory.<br />

If opening the instrument is inevitable, it shall first be disconnected from all voltage<br />

sources.<br />

Make sure that the mains supply has been disconnected.<br />

Repair or adjustment of an opened instrument under voltage shall be carried out only<br />

by a skilled person who is aware of the hazard involved.<br />

Remember that the voltage across accessible parts of the open instrument may be<br />

dangerous to life.<br />

Whenever it is likely that the protection has been impaired, the instrument shall be<br />

made inoperative and secured against any unintended operation.<br />

The protection is likely to be impaired if, for example:<br />

the instrument shows visible damage<br />

the instrument fails to perform the intended measurements<br />

after prolonged storage at temperatures above 70 C<br />

after severe transport stresses<br />

Before recommisioning the instrument, a professional routine test according to<br />

EN 61010-1 shall be performed. This test should be carried out at our factory.<br />

Information<br />

I

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!