23.03.2014 Views

Process Unit 73 LF - Knick

Process Unit 73 LF - Knick

Process Unit 73 LF - Knick

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Process</strong> <strong>Unit</strong> <strong>73</strong> <strong>LF</strong><br />

Installation and Start-Up<br />

Installation of the <strong>Process</strong> <strong>Unit</strong> <strong>73</strong> <strong>LF</strong> must be carried<br />

out only by specially trained personnel in accordance<br />

with this instruction manual and per applicable<br />

local and national codes. Make sure that<br />

the technical specifications and input ratings are<br />

observed.<br />

For information on installation, refer to chapter 10.<br />

Start-up of the <strong>Process</strong> <strong>Unit</strong> <strong>73</strong> <strong>LF</strong> must be carried<br />

out only by specially trained personnel in accordance<br />

with this instruction manual and per applicable<br />

local and national codes.<br />

Before first start-up, a complete parameter setting<br />

procedure must be performed.<br />

At ambient temperatures below 0 C, LC display<br />

readability might be restricted. This does not affect<br />

instrument function.<br />

Real-time clock, logbook, cal record and sensor<br />

statistics are battery backed for approx. 1 year.<br />

After longer power outages these data can be lost.<br />

In that case the <strong>Process</strong> <strong>Unit</strong> displays ”Warn Time/<br />

Date” and the date is reset to 01-01-1990. Time<br />

and date must be updated.<br />

II<br />

Information

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!