23.03.2014 Views

Process Unit 73 LF - Knick

Process Unit 73 LF - Knick

Process Unit 73 LF - Knick

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

9 Capabilities of the <strong>Process</strong> <strong>Unit</strong> <strong>73</strong> <strong>LF</strong><br />

Installation of the <strong>Process</strong> <strong>Unit</strong> <strong>73</strong> <strong>LF</strong> must be carried<br />

out only by specially trained personnel in accordance<br />

with this instruction manual and per applicable<br />

local and national codes.<br />

Prior to commissioning, a complete parameter setting<br />

procedure must be performed.<br />

Overview<br />

The <strong>Process</strong> <strong>Unit</strong> <strong>73</strong> <strong>LF</strong> provides a great variety of<br />

features and capabilities.<br />

This chapter describes<br />

<br />

<br />

<br />

the instrument’s measurement capabilities<br />

how to connect the instrument<br />

how to set the parameters<br />

Power Supply for the <strong>Process</strong><br />

<strong>Unit</strong> <strong>73</strong> <strong>LF</strong><br />

Read chapter 10 ”Information on Installation” before<br />

connecting the power supply!<br />

Check if your mains voltage corresponds to the<br />

ratings given on the instrument’s rating plate:<br />

<br />

230 Vac<br />

115 Vac (option 363)<br />

24 Vac/dc (option 298)<br />

For approx. 10 s after connection of power supply,<br />

the current outputs and contacts are frozen at the<br />

levels before power supply failure. This ensures<br />

that no invalid messages are activated after<br />

power-on.<br />

Capabilities 9–1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!