chapter 6 - Malaysia Productivity Corporation ( MPC)

chapter 6 - Malaysia Productivity Corporation ( MPC)

chapter 6 - Malaysia Productivity Corporation ( MPC)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

START<br />

NFP<br />

Plan<br />

Verification<br />

OSC<br />

DBKL<br />

JPRB<br />

Planning<br />

Permission<br />

JRBB<br />

Building<br />

Plan<br />

JPIF<br />

PJ<br />

Earthwork<br />

JPIF<br />

MSMA &<br />

SPAH<br />

JKAS<br />

RORRO<br />

Bin<br />

PPSPPA<br />

Waste<br />

Diaposal sys.<br />

BOMBA<br />

Plan<br />

Approval<br />

IWK<br />

Sewerage<br />

Planning<br />

Before<br />

Construction<br />

JPRB<br />

Landscape<br />

Permission<br />

JRPB<br />

Hoarding &<br />

Signboard<br />

JPIF<br />

PJ<br />

Road & Drainage<br />

JPIF<br />

Car<br />

Park<br />

IWK<br />

Sewerage<br />

Design<br />

From the above chart, it was observed there are 32 procedures to be fulfilled in acquiring the construction<br />

permits. Subsequent interaction and investigation between the relevant parties reviewed that the whole<br />

process can be simplified into 12 procedures as shown chart 2. The simplified procedure is anticipated<br />

to record a cost saving of RM25.6 million per year. In terms of mandays, it is estimated that the period to<br />

complete the whole process will be shortened from 220 days to 100 days.<br />

60 <strong>Productivity</strong> Report 2011/2012<br />

32 EXISTING PROCEDURES<br />

JPIF<br />

PJ<br />

Street Light<br />

JKAWS<br />

Road<br />

Excavation<br />

JRBB<br />

From B<br />

(Building)<br />

JPIF<br />

From B<br />

(Earthwork)<br />

IWK<br />

Commencement<br />

of Work<br />

During<br />

Construction<br />

IWK<br />

Inspection<br />

IWK<br />

Inspection<br />

Report<br />

Source: Public Consultation Paper ‘ Dealing with Construction Permit in Kuala Lumpur ’<br />

JPIF<br />

Road & Drainage<br />

Inspection<br />

JPIF<br />

Road & Drainage<br />

Approval<br />

BOMBA<br />

Inspection<br />

BOMBA<br />

Approval<br />

IWK<br />

Testing &<br />

Commissioning<br />

IWK<br />

Clearance<br />

After<br />

Construction<br />

LAM/BEM<br />

Deposit<br />

CCC<br />

OSC<br />

Deposit<br />

CCC<br />

Connection<br />

To Utilities<br />

SYABAS<br />

Inspection<br />

SYABAS<br />

Water<br />

Connection<br />

NSP<br />

Phone<br />

Connection<br />

End