Rapid Assessment for Resilient Recovery and ... - GFDRR

Rapid Assessment for Resilient Recovery and ... - GFDRR

Rapid Assessment for Resilient Recovery and ... - GFDRR

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Category Type ~6 months 6-24 months >24 months<br />

L<strong>and</strong>-based communications<br />

Replacement of damaged leased-line communications<br />

equipment (nodes with equipment,<br />

co-axial cables, air conditioner, generator,<br />

modem equipment, inter-change fiber cabling,<br />

etc.) to ensure post recovery services.<br />

Replacement of damaged voice <strong>and</strong> data<br />

communications equipment (primary cables <strong>and</strong><br />

other relevant equipment such as DSLAMs,<br />

MSANs, pay phones, etc.) to ensure post<br />

recovery services<br />

Estimates <strong>for</strong> retrofitting to increase resilience<br />

<strong>and</strong> ensure mitigation of future disasters,<br />

including civil works.<br />

SUBTOTAL<br />

Cellular communications<br />

Replacement of damaged telecom system<br />

equipment, equipment <strong>for</strong> 2G <strong>and</strong> 3G cell sites,<br />

battery, cooling systems, etc., to ensure post<br />

recovery services.<br />

Estimates <strong>for</strong> retrofitting to increase resilience of<br />

cell sites <strong>and</strong> to ensure mitigation of future<br />

disasters.<br />

SUBTOTAL<br />

Broadcasting<br />

Repair of buildings, offices, facilities, <strong>and</strong> roads<br />

in flooded stations.<br />

Replacement of damaged equipment<br />

(transmission equipment, satellite dish/base, TV<br />

<strong>and</strong> digital cameras, repair of three DSNG<br />

vehicles <strong>and</strong> equipment, TV set top boxes),<br />

repair of vehicles <strong>and</strong> equipment.<br />

Repair of community radio room <strong>and</strong> replacement<br />

of equipment.<br />

Reconstruction of 10 broadcasting stations with<br />

higher buildings.<br />

Estimates <strong>for</strong> retrofitting to increase resilience<br />

<strong>and</strong> ensure mitigation of future disasters, civil<br />

works.<br />

SUBTOTAL<br />

Postal services<br />

Reconstruction/repair of damaged post offices(77).<br />

Reconstruction/repair of counter service sets (50).<br />

Replacement of damaged computers, printers,<br />

electricity system, etc. in 30 affected post offices.<br />

Estimates <strong>for</strong> retrofitting to increase resilience<br />

<strong>and</strong> ensure mitigation of future disasters, civil<br />

works.<br />

SUBTOTAL<br />

TOTAL<br />

167.22<br />

575.15<br />

220.0<br />

926.37<br />

280.92<br />

84.0<br />

364.92<br />

22.52<br />

59.19<br />

48.60<br />

40.0<br />

170.20<br />

130.0<br />

2.0<br />

3.0<br />

42.0<br />

177.0<br />

1,674.49<br />

66.0<br />

0<br />

345.0<br />

0<br />

120.0 180.0<br />

531.0 180.0<br />

238.70<br />

0<br />

303.0 270.0<br />

541.70 270.0<br />

3.6<br />

190<br />

170.0 170.0<br />

173.6 360.0<br />

175.0 170.0<br />

175.0 170.0<br />

1,421.3 980.0<br />

Notes: Substantive mitigation measures <strong>for</strong> implementation in the medium <strong>and</strong> long term should be further defined with<br />

details through an assessment of the affected systems to be carried out once the flooding situation permits.<br />

Table 46: Telecommunications<br />

sector – Activities <strong>and</strong><br />

costs <strong>for</strong> short-, medium<strong>and</strong><br />

long-term recovery <strong>and</strong><br />

reconstruction in Thai baht,<br />

millions<br />

134 THAI FLOOD 2011 RAPID ASSESSMENT FOR RESILIENT RECOVERY AND RECONSTRUCTION PLANNING