ment/installation is THB 3 million per unit (OECD 2006). Additionally, mangrove af<strong>for</strong>estation is needed to<br />

increase the mangrove <strong>for</strong>est coverage by 10 percent.<br />

Medium-term needs include O&M cost of running the new water quality monitoring stations at the cost of<br />

THB 1000/unit/day <strong>and</strong> maintenance cost of mangrove <strong>for</strong>est as well as additional af<strong>for</strong>estation of 10 percent<br />

per year <strong>for</strong> two years.<br />

Long-term needs include O&M cost of running the new water quality monitoring stations <strong>and</strong> maintenance<br />

cost of mangrove <strong>for</strong>est.<br />

Industrial Waste (All Private)<br />

Damage is calculated based on the level of impact (low 25%, medium 50%, <strong>and</strong> high 100%) as a percentage<br />

of equipment costs, as the flood has mostly affected the equipment <strong>and</strong> not the physical structure of<br />

the facility. Losses are calculated based on the services that were not provided as the waste especially<br />

wastewater is still left in the facilities as a percentage of daily O&M costs (assume 20% of the capital costs)<br />

times the number of day the facilities are out of service (assume 60 days).<br />

Short-term needs are based on the repair <strong>and</strong> recovery costs (assume 1.2 time of the damage) to allow the<br />

facilities to be fully operational when the plants are re-commissioned.<br />

Medium-term needs are based on upgrading <strong>and</strong> climate proofing costs which are assumed to be 1.5 times<br />

of the original capital costs (excluding l<strong>and</strong> costs) as cleaner technology <strong>and</strong> more resilient material are now<br />

available.<br />

Long-term needs are mostly O&M costs of the newly upgraded facilities (assume 20% of the capital costs).<br />

THAI FLOOD 2011 RAPID ASSESSMENT FOR RESILIENT RECOVERY AND RECONSTRUCTION PLANNING<br />