2.4 Generate <strong>Appraisal</strong> Results<br />

Purpose<br />

Rate goal satisfaction based upon the extent of practice implementation<br />

throughout the organizational unit. The extent of practice implementation is<br />

judged based on validated data (e.g., direct, indirect, and affirmation objective<br />

evidence) collected from the entire representative sample of the organizational<br />

unit. The rating of capability levels and/or maturity levels is driven by the<br />

goal satisfaction ratings.<br />

Entry Criteria The set of validated preliminary findings, statements of practice<br />

implementation gaps, and/or tabulations of validated objective evidence of<br />

practice implementation on which they are based are available. Team<br />

members are confident that they have obtained all the pertinent data they will<br />

need to make rating judgments. The data obtained completely covers the<br />

practices within the defined <strong>CMMI</strong> model scope and the entire representative<br />

sample selected <strong>for</strong> the organizational unit.<br />

Inputs<br />

<strong>Appraisal</strong> data<br />

• validated preliminary findings<br />

• tabulations of objective evidence of practice implementation<br />

• annotated worksheets, checklists, working notes<br />

Activities 2.4.1 Derive Findings and Rate Goals<br />

2.4.2a Determine <strong>Process</strong> Area Capability Level<br />

2.4.3a Determine Capability Profile<br />

2.4.2b Determine Satisfaction of <strong>Process</strong> Areas<br />

2.4.3b Determine Maturity Level<br />

2.4.4 Document <strong>Appraisal</strong> Results<br />

Outputs • Final findings<br />

• Recorded rating decisions<br />

Outcome<br />

Exit Criteria<br />

A <strong>for</strong>mal rating decision <strong>for</strong> each reference model component that was<br />

planned to be rated, and <strong>for</strong> which the team obtained complete or sufficient<br />

data<br />

Ratings against all components per the plan have been made and recorded.<br />

Continued on next page<br />